Bridge guardrail C post
The method of installing C-shaped columns is as follows:
1. Preparation: Confirm the installation position and quantity, and measure the appropriate size. Prepare required tools and materials, such as electric drills, screwdrivers, screws, nuts, and wrenches.
2. Install support: Secure the column support to the ground or wall, and secure the support using screws and nuts. Ensure the position and levelness of the support.
3. Install the column: Insert the C-shaped column into the support and ensure that the column is fully embedded in the support.
The production process of the C post
Material selection: Cut the raw material slats, use the bending machine to form, a total of 4 times bending molding
Quick Details of Guardrail Beam C Post:
Place of Origin | Shandong, China | Brand Name: | Forst |
Product name | C Post | Material | S235JR S355JR |
Surface treatment | Hot Dipped Galvanized | Feature | Impact and corrosion resistant |
Certificate | ISO9001,AASHTO M180 | Specification | 149*110*19*4.3*1830(mm) 120*68*20*5*1500(mm) 100*50*25*5*1500(mm) |
Application: | Support guardrail beam | Color | silver white |
MOQ: | 100pcs | Packaging Details | Bundled |
Shipping port | Qingdao Tianjin or other | Supply Ability | 15000 Ton/ per Year |
Galvanized C-post refers to the use of steel plate new section steel, cold-rolled bending molding, uniform wall thickness, cross-section. Compared with old-fashioned hot rolling, it can save 30% of the material and the strength is the same.
Product picture of Guardrail Beam C Post:
The C post is galvanized by hanging plating process, vertically placed into a 12-meter-long galvanized pool, controlled for a certain period of time, after the completion of galvanized, slowly lifted, left the galvanized pool, transferred to the pool for cooling, and then transferred to the pool containing passivation liquid for passivation treatment, to keep the zinc surface more stable